Method
A concept earns each gate with a measurement. The gate names the artifact and the condition that stops the work.
Gates
- G0Concept note. The capability, the problem and the question are written down.
- G1Model. A deterministic model of the core decision, automated tests, and a bench plan with instruments and quantities.
- G2Bench rig. A rig on synthetic or recorded data, with a measured baseline and stated uncertainty.
- G3Measured prototype. A prototype measured against a stated requirement, with its limits written down.
- G4External review. An outside reviewer or a second team reproduces the result, and the result is published.
The four questions
A concept must answer yes to all four before it gets a repository.
- Physics. The effect is allowed by known physics.
- Body. The first prototype is handheld, wearable or benchtop. No implant.
- Clinic. The first measurement needs no clinical trial.
- Money. The first rig fits on two benches.
Evidence
Every result that leaves a project is a record with four parts: the artifact and its SHA-256 hash, the engine and its version, the command that reproduces the run, and the limits. A clean run is not proof of safety, and the record says so.
Limits we keep
- -No weapons, targeting, payloads or combat use.
- -No human implant. Every project is wearable, handheld or benchtop.
- -No medical claim. A health-adjacent project produces a triage prompt, not a diagnosis.
- -No live target. Testing uses owned equipment, synthetic data or consenting adults under a written protocol.
- -Every actuator has a mechanical stop. Every autonomous agent has a kill switch that does not depend on the agent.